๐ŸŒฟ How to Get Environmental Approval from EPA

Markaz

Last Update 3 days ago

Environmental approvals are required for projects exceeding 2 or more floors, covering large areas, or located near protected zones.


Steps:

  1. Hire a licensed environmental consultant

  2. Conduct an EIA (Environmental Impact Assessment)

  3. Submit EIA Report to your provincial Environmental Protection Agency (EPA):

    • Punjab EPA (Lahore)

    • Sindh EPA (Karachi)

    • KP EPA (Peshawar)

    • Balochistan EPA (Quetta)

  4. Public Hearing (if required)

  5. Receive NOC โ€“ Usually issued in 30โ€“60 days


Documents Needed:

  • Project design and layout

  • Construction plan

  • Waste disposal and water use strategy

  • Mitigation measures


Pro Tip: EPA approvals often take longer than expected. Start early.